Compare our prices!
Cost of swimming pools in Spain
6x3 = from 11,000 euros excavation not included
8x4 = from 14,000 euros excavation not included
10x5 = from 21,000 euros excavation not included
12x6 = from 31,000 euros excavation not included
Paid in stage payments:-
1st payment upon installation of the base with all plumbing
2nd Payment upon installation of all steels and concrete
3rd Payment upon completion
The price includes:
Tiled, Pump, filter & filter box installed close to the pool, 2 jets,
2 lights positioned wherever the client would like, Metal steps to get in
and out the pool, skimmer
Build the swimming pool pool of your dreams from as little as 11,000€
We Cover a huge area of Spain including: Costa
Blanca, Costa Del Sol, Costa Brava and inland

Extras:
Pictures at the bottom of the pool e.g. Dolphin etc
Terracing
Showers
Bar
Jacuzzi
Bridges across the pool
Roof's (aluminium, pvc etc)
Pool covers
BBQ areas, Kitchen areas
Pump House
Anything else you wish to personalise your pool we can accomodate most requests!!!
If the ground is soft a further 20cm of concrete will be laid to act as a foundation
to give more stability to the pool.
A pool from start to finish takes approximately 4 weeks.
![]() |
![]() |
![]() |
Construction method:
The blocks are laid to form the shape of the pool (block size = 20x20x40)
All pipe work, plumbing and electrics are installed
The steel base then goes down and all steel around the walls. Steel mats
and further steels are then inserted to keep the structure together and
strong. This takes approximately 4 days as it is so vital to ensure all
steel work is correctly laid, otherwise the pool would crack.
The concrete is then sprayed on or laid by hand depending on location of
the pool. This is then left to dry for approximately 1-2 days depending
on the weather to ensure a solid base.
A waterproof sealant is then applied onto all concrete to ensure the pool
is water tight
The tiles are then laid from top to bottom.
The tiles are then grouted and left for 2-3 days to dry
The water is then added to the pool ready to enjoy
ALL THIS CAN BE DONE WITHIN
APPROXIMATELY 4 WEEKS ONCE WE HAVE THE BUILDING LICENSE AND WE CAN TRAVEL
ANYWHERE IN SPAIN!!!!
WE WILL GIVE YOU AN HONEST RELIABLE SERVICE AND ADVISE ON POOL SHAPES SIZES
ETC TO SUIT YOUR NEEDS
DONT DELAY...E-MAIL OR CALL US TODAY AND HAVE YOUR DREAM POOL BUILT
WE WILL NOT LET YOU DOWN
ALL WORK CARRIED OUT IS DONE PROFESSIONALLY AND LEGALLY WITH CONTRACTS AND
THERE ARE NO HIDDEN CHARGES!!!!!
For all your swimming pool needs in Spain. We buiold swimming pools in Spain and now have the option to build them in eco friendly ICF saving money and keeping the pool warmer longer.

Spanish Area Information / Javea tourist information / Jalon valley tourist information / Orba tourist information / Moraira tourist information / Albaida Valley information / Cocentaina tourist information / Ayora valley tourist information / benimarfull tourist information / Agres information / gaianes tourist information / planes tourist information / ontinyent tourist information / bocairent tourist information / alcoy tourist information / muro de alcoy tourist information / Calpe tourist information / Denia tourist information / Elche tourist information / Gandia tourist information / Jalon tourist information / Javea area information / Jumilla tourist information / oliva area information / Parcent information / Alcalali information / Benichembla information / Benidoleig information / Benissa information / Lliber information / Senija information / Jalon information
© 2005 Buy Inland. All rights reserved.